Yavne2

Yavne, Israel >

Yavne2

X

Yavne, Israel
Sector: Water
Role: EPC
Status: Completed
Main Figures: Capacity 800 m³/day
Description: Upgrading of a municipal wastewater treatment facility
להב pv

Lahav PV Solar >

להב pv

X

Lahav PV Solar
Sector: Energy
Role: EPC
Status: Ongoing
Construction Completion Date: 2022
Main Figures: Capacity 9MW of power
Description: Solar PV installed and operated over water reservoir

Lahav Bio, Israel >

X

Lahav Bio, Israel
Sector: Energy
Role: EPC
Status: Completed
Construction Completion Date: 2022
Main Figures: • Energy Capacity: 670 kW/hr
• Reactor Volume: 6,700 m³
• Bio Gas Flow: 7,400 Normal m³/day
Description: Biogas facility, converting plants waste and animals excretion into electricity
יגור

Yagur, Israel >

יגור

X

Yagur, Israel
Sector: Energy
Role: EPC
Status: Completed
Construction Completion Date: 2020
Main Figures: Capacity of 600KV
Description: Solar PV installed and operated over water reservoir
גן שמואל

Gan Shmuel, Israel >

גן שמואל

X

Gan Shmuel, Israel
Sector: Energy
Role: EPC O&M
Status: Ongoing
Construction Completion Date: 2020
Main Figures: Capacity of 3.3MW + 1.6 tons of steam/hr
Description: Cogeneration power plant driven by natural gas

Prigat, Israel >

X

Prigat, Israel
Sector: Energy
Role: EPC O&M
Status: Ongoing
Construction Completion Date: 2023
Main Figures: Capacity of 2.7MW + 13. tons of steam/hr
Description: Cogeneration power plant driven by natural gas

Beerot Yachin, Israel >

X

Beerot Yachin, Israel
Sector: Water
Role: BOT
Status: Ongoing
Main Figures: Capacity of 2,000 m³/hr
Description: Drilling water well for agriculture use

NETA Yehudit, Israel >

X

NETA Yehudit, Israel
Sector: Water
Role: BOO
Status: Completed
Construction Completion Date: 2019
Main Figures: Capacity of 400 m³/hr
Description: Treatment of lowered groundwater by removing VOCs. Technology - Activated Carbon
יפאורה

Jafora Tabori, Israel >

יפאורה

X

Jafora Tabori, Israel
Sector: Water
Role: EPC O&M
Status: Ongoing
Construction Completion Date: 2016
Main Figures: • Capacity 200 m³/hr
• Over 90% removal of Nitrate (NO3)
• Over 99% removal of Chloride
• Over 98% removal of TDS
Description: Water Well Treatment Plant installed in the premises of one of the largest beverages producers in Israel. Technology - Sand filters, RO, Carbon
זבולון

Matash Zvulun, Israel >

זבולון

X

Matash Zvulun, Israel
Sector: Water
Role: EPC
Status: Completed
Construction Completion Date: 2017
Main Figures: Capacity of 600 m³/hr
Description: Biological Wastewater Treatment Plant. Tertiary treatment
רעננה

Mey Ra’anana ‐ Institute 23, Israel >

רעננה

X

Mey Ra’anana ‐ Institute 23, Israel
Sector: Water
Role: BOO
Status: Ongoing
Construction Completion Date: 2021
Main Figures: Capacity of 230 m³/hr
Description: Removal of organic contaminates and Nitrate from salty well water. Technology ‐ RO, Sand filters & Activated Carbon
מקורות

Pipe Jacking Mekorot, Israel >

מקורות

X

Pipe Jacking Mekorot, Israel
Sector: Water
Role: Construction
Status: Completed
Main Figures:
• Total Pipeline Length: 1,170 meters
• Pipeline Diameter: 250cm-310cm
Description: 3 selected projects in recent years in which jacking was performed under mountains and highways
HDD Selected

Igudan HDD, Israel >

HDD Selected

X

Igudan HDD, Israel
Sector: Water
Role: Construction
Status: Ongoing
Construction Completion Date: 2023
Main Figures:
• Total Pipeline Length: ~2.5km
• Pipeline Diameter: 2,000mm
Description: Laying sewage pipeline via HDD and extrusion works
הבונים

Habonim, Israel >

הבונים

X

Habonim, Israel
Sector: Water
Role: Construction
Status: Completed
Construction Completion Date: 2020
Main Figures: Capacity of 3,500,000 m³
Description: Construction of a reservoir
איגודן

Igudan PJ, Israel >

איגודן

X

Igudan PJ, Israel
Sector: Water
Role: Construction
Status: Completed
Construction Completion Date: 2016
Main Figures: Pipeline Length: 480 meters • Pipeline Diameter: 216cm
Description: Pipe Jacking works in the city of Tel Aviv
מי גת

Mey Gat, Israel >

מי גת

X

Mey Gat, Israel
Sector: Water
Role: Construction O&M
Status: Completed
Main Figures: Pumping Station Flow Rate: 4,000 m³/hr
Description: Construction of reservoir, pipelines, pumping stations, control and monitoring system
Biqat-Hanadiv1

Biq’at Hanadiv, Israel >

Biqat-Hanadiv1

X

Biq’at Hanadiv, Israel
Sector: Water
Role: BOO
Status: Ongoing
Main Figures: • Pumping station: 2,000 m³/hr
• Reservoir: 2,300,000 m³
Description: Supply of treated wastewater. Infrastructure included drilled water wells, reservoir, pipelines, pumping stations, control and monitoring system
Mey-Shoket1

Mey Shoket, Israel >

Mey-Shoket1

X

Mey Shoket, Israel
Sector: Water
Role: BOO
Status: Ongoing
Construction Completion Date: 2020
Main Figures:  
• Shoket Pumping Station: 2,100 m³/hr
• Shoket Reservoir: 225,000 m³
• Lahav Pumping Station: 1,200 m³/hr
• Lahav Reservoir: 1,500,000 m³
Description: Supply of treated wastewater & floodwater for agriculture. Technology - filtration & disinfection Infrastructure included reservoirs, pipelines, pumping stations, control and monitoring system
Brine-South1

Brine South- KG – Askelon, Israel >

Brine-South1

X

Brine South- KG – Askelon, Israel
Sector: Water
Role: BOT
Status: Ongoing
Construction Completion Date: 2023
Main Figures: • Capacity: 870m³/hr • Pipeline Length: over 35km • Pipeline Diameter: 315mm-500mm
Description: Expansion of a Brine treatment and discharge facility.
שורק

Sorek 2, Israel >

שורק

X

Sorek 2, Israel
Sector: Water
Role: Construction
Status: Ongoing
Main Figures: • Pipeline placement 15 m. below sea • Pipeline length: 8km
Description: Drilling and water pipeline laying. Works include drilling both at inshore and offshore and laying sea water intake & outtake pipeline to and from the Sorek 2 desalination facility
Ambar1

Ambar, Israel >

Ambar1

X

Ambar, Israel
Sector: Energy
Role: EPC O&M
Status: Ongoing
Construction Completion Date: 2018
Main Figures: Capacity - 2.4MW + 1.4 tons steam/hr
Description: Cogeneration power plant driven by natural gas

Sabha Eilat, Israel >

X

Sabha Eilat, Israel
Sector: Water
Role: EPC
Status: Ongoing
Construction Completion Date: 2024
Main Figures:
Inner & Outer Diameters: 160cm, 216cm • Length ~1,500 meters
Description: Design and build of a new seawater intake system, including construction of a pumping station within the expansion of an existing desalination facility

Ya’alon Ktora, Israel >

X

Ya’alon Ktora, Israel
Sector: Water
Role: Construction
Status: Ongoing
Construction Completion Date: 2023
Main Figures: Diameter: up to 26'' • Maximum depth: 600 meters
Description: Water wells drilling
ic

Water For All, Ivory Coast >

ic

X

Water For All, Ivory Coast
Sector: Water
Role: EPC
Status: Ongoing
Construction Completion Date: 2024
Main Figures: Supply of drinking water for a population of over one million located across 111 sites
Description: Financing arranger and EPC Contractor. Works include water wells drilling, water treatment systems, water towers and pipeline