< back to projects

Sabha Eilat, Israel

Sector: Water

Role: EPC

Construction Completion Date: 2024

Main Figures: Inner Diameter: 160cm Outer Diameter: 216cm Length: ~1,500 meters

Description: Design and build of a new seawater intake & discharge system, including construction of a pumping station within the expansion of an existing desalination facility