< back to projects

Sabha Eilat, Israel

Sector: Water

Role: EPC

Status: Ongoing

Construction Completion Date: 2024

Main Figures:

Inner Diameter: 160cm
Outer Diameter: 216cm
Length: ~1,500 meters

Description: Design and build of a new seawater intake & discharge system, including construction of a pumping station within the expansion of an existing desalination facility