Highway No. 6 North, Israel
Sector: Infrastructure
Role: Construction
Construction Completion Date: 2019
Main Figures:
• 1.1Mm3 of earth excavation
• 1.3 Mm3 of earth filling
• 150,000m3 of bedding
Description: Construction works performed by 'Baerl Rimon' for Section 7 of Highway No. 6 North